[{"data":1,"prerenderedAt":159},["ShallowReactive",2],{"content-\u002Ffeatures\u002Fland-and-site":3},{"id":4,"title":5,"add_ons":6,"body":7,"comparison":6,"cta":14,"description":17,"extension":18,"faq":6,"feature_matrix":6,"features":19,"features_subtitle":70,"features_title":71,"hero":6,"hero_spotlight":72,"integrations":6,"layout":6,"meta":87,"navigation":88,"path":89,"personas":6,"plan":6,"plans":6,"process":6,"related_features":6,"sections":6,"seo":90,"show_cta":93,"showcase":94,"stem":143,"trust_bar":144,"__hash__":158},"content\u002Ffeatures\u002Fland-and-site.md","Land &amp; Site — SAMRISK",null,{"type":8,"value":9,"toc":10},"minimark",[],{"title":11,"searchDepth":12,"depth":12,"links":13},"",3,[],{"headline":15,"subhead":16},"Manage the land like the legal entity it is","Add a site to your account and start with whichever module matters first. Bundle 3+ for 25% off the Land Pack.","Manage the land your buildings sit on. Title register, boundaries, trees, TPOs, buried services, BNG, planning consents — every legal layer of the land, on an interactive satellite map.","md",[20,25,30,35,40,45,50,55,60,65],{"icon":21,"title":22,"description":23,"to":24},"i-lucide-square-dashed","Land &amp; boundaries","Title register, easements, party walls, wayleaves.","\u002Ffeatures\u002Fland-boundaries",{"icon":26,"title":27,"description":28,"to":29},"i-lucide-trees","Grounds &amp; landscape","Trees, hedges, paths, walls, fences. QR tags for ancient trees.","\u002Ffeatures\u002Fgrounds-landscape",{"icon":31,"title":32,"description":33,"to":34},"i-lucide-shield-check","Tree Preservation Orders","TPO consents with the 6-week LPA deadline tracker.","\u002Ffeatures\u002Ftpo-register",{"icon":36,"title":37,"description":38,"to":39},"i-lucide-cable","Sub-surface services","Buried services + Permit to Dig workflow.","\u002Ffeatures\u002Fsubsurface-services",{"icon":41,"title":42,"description":43,"to":44},"i-lucide-alert-triangle","Site risks &amp; searches","Radon, flood, contaminated land — auto-refreshed annually.","\u002Ffeatures\u002Fsite-risks",{"icon":46,"title":47,"description":48,"to":49},"i-lucide-file-badge","Planning consents","Every consent with pre-commencement condition tracking.","\u002Ffeatures\u002Fplanning-register",{"icon":51,"title":52,"description":53,"to":54},"i-lucide-flower-2","Biodiversity Net Gain","DEFRA metric, 30-year monitoring, S106 compliance.","\u002Ffeatures\u002Fbng-tracker",{"icon":56,"title":57,"description":58,"to":59},"i-lucide-pencil-ruler","Pre-construction proposals","Sites without buildings. Constraints, decisions, design.","\u002Ffeatures\u002Fproposals",{"icon":61,"title":62,"description":63,"to":64},"i-lucide-droplet","Drainage &amp; SuDS","Sustainable drainage — swales, ponds, soakaways. SAB approval.","\u002Ffeatures\u002Fdrainage-suds",{"icon":66,"title":67,"description":68,"to":69},"i-lucide-mountain","Site setting &amp; heights","Elevation, adjacent heights, designations, aviation, solar.","\u002Ffeatures\u002Fsite-setting","Each module is a Stripe add-on. Pick what you need — community halls ignore BNG; developers buy all nine and save 25% with the Land Pack bundle.","Nine modules, à la carte",{"eyebrow":73,"headline":74,"highlight_word":75,"subhead":76},"LAND + SITE","The land,","drawn.",{"Creating a site and drawing its boundary is free on every plan — including Free":77,"trust_note":79,"cta":80},{" Then add the ten land modules you need":78},"boundaries register, grounds, TPOs, BNG, sub-surface, risks, planning, proposals, drainage, setting. Each ships an interactive satellite-map workspace with statutory features tied to UK law competitors don't have.","Sites free on every plan. Add modules à la carte. UK-specific, built on the legal framework that actually applies.",{"primary":81,"secondary":84},{"label":82,"to":83},"Start free","https:\u002F\u002Fapp.samrisk.co.uk\u002Fsignup",{"label":85,"to":86},"See pricing","\u002Fpricing",{},true,"\u002Ffeatures\u002Fland-and-site",{"ogTitle":91,"ogDescription":92,"title":5,"description":17},"SAMRISK — Land &amp; Site management for UK property","TPOs, BNG, sub-surface, planning. Eight UK-law-specific modules for land. Built into the same platform as your buildings.",false,{"title":95,"subtitle":96,"items":97},"Around, under, before — every layer of the land","The site shell — create a site, draw its boundary, documents, calendar — is free on every plan. Ten purpose-built modules sit on top, each tied to a UK statute, each with its own map workspace. Add what you need.",[98,109,120,131],{"eyebrow":99,"title":100,"description":101,"bullets":102,"visual":26,"visual_label":99,"cta":107},"AROUND","Boundaries, grounds, and TPOs","Title register, easements, party walls, wayleaves. Tree and hedge register cross-referenced to Tree Preservation Orders with the 6-week LPA decision deadline tracker. Hedgerow Regulations 1997 \"important\" hedge protection built in.",[103,104,105,106],"Party Wall etc. Act 1996 notice trigger detection","TPO consent applications with auto-calculated deadlines","Hedgerow Regulations 1997 \"important\" hedge flag","Tree QR tags for inspection logging",{"label":108,"to":34},"Explore TPOs",{"eyebrow":110,"title":111,"description":112,"bullets":113,"visual":36,"visual_label":110,"cta":118},"UNDER","Sub-surface services + Permit to Dig","Every buried service — gas, water, electric, fibre, sewer. Asbestos-in-ground records. Permit-to-Dig workflow with a six-item pre-excavation checklist (CAT scan, utilities contacted, hand-dig zone, asbestos screen, isolation plan) that gates the approval.",[114,115,116,117],"Buried-services register with route geometry","Permit to Dig with checklist-gated approval","HSWA 1974 buried-services duty of care","Asbestos-in-ground records (Control of Asbestos Regs 2012)",{"label":119,"to":39},"Explore sub-surface",{"eyebrow":121,"title":122,"description":123,"bullets":124,"visual":56,"visual_label":121,"cta":129},"BEFORE","Pre-construction and BNG","A site without a building yet. Viability checklists, constraints mapping, decisions log. Statutory Biodiversity Net Gain accounting (DEFRA metric v4) with the 30-year monitoring plan and S106 \u002F conservation-covenant compliance tracking.",[125,126,127,128],"Sites with zero buildings — proposed status","Site-constraints summary PDF for planning applications","DEFRA biodiversity metric v4 calculator","30-year management plan + annual monitoring reports",{"label":130,"to":54},"Explore BNG",{"eyebrow":132,"title":133,"description":134,"bullets":135,"visual":140,"visual_label":132,"cta":141},"SEARCHES","Site risks and planning consents","Radon class (UKHSA), contaminated land status (s78A EPA 1990), flood zone (EA), coal authority, mining. Phase 1 and Phase 2 environmental reports cross-referenced. Planning consents register with pre-commencement condition tracking.",[136,137,138,139],"Annual postcode re-check against government datasets","Planning permissions with lapse-date tracking","Pre-commencement condition discharge workflow","S106 and S278 obligations as compliance items","i-lucide-file-search",{"label":142,"to":44},"Explore site risks","features\u002Fland-and-site",{"stats":145},[146,149,152,155],{"value":147,"label":148},10,"Land modules",{"value":150,"label":151},"Maps","On every module",{"value":153,"label":154},"BNG","30-year monitoring",{"value":156,"label":157},"SuDS","SAB approval","O471UZR_AMU0jOsocUQo-7piVgmG1HtIVHHuBx55KqY",1779029148184]