[{"data":1,"prerenderedAt":96},["ShallowReactive",2],{"content-\u002Ffeatures\u002Fproposals":3},{"id":4,"title":5,"add_ons":6,"body":7,"comparison":6,"cta":14,"description":17,"extension":18,"faq":19,"feature_matrix":6,"features":6,"features_subtitle":6,"features_title":6,"hero":6,"hero_spotlight":28,"integrations":6,"layout":6,"meta":40,"navigation":41,"path":42,"personas":6,"plan":6,"plans":6,"process":6,"related_features":6,"sections":6,"seo":43,"show_cta":45,"showcase":46,"stem":80,"trust_bar":81,"__hash__":95},"content\u002Ffeatures\u002Fproposals.md","Pre-construction Proposals — SAMRISK",null,{"type":8,"value":9,"toc":10},"minimark",[],{"title":11,"searchDepth":12,"depth":12,"links":13},"",3,[],{"headline":15,"subhead":16},"Start tracking the land before the building exists","Included free with Pro, Business and Enterprise.","A site without a building yet. Viability checklists, constraints mapping, decisions log, design submissions. Auto-generates a site-constraints summary for planning applications.","md",{"title":20,"items":21},"Proposals — questions",[22,25],{"q":23,"a":24},"Do I need any other land add-ons to use proposals?","No — proposals work standalone. But the site-constraints summary becomes much richer when you also have TPOs, sub-surface, planning, BNG.",{"q":26,"a":27},"Can a proposal exist without buildings forever?","Yes — sites in \"proposed\" status have no buildings. When you get consent, create a building under the site. The proposal record remains as historical context.",{"eyebrow":29,"headline":30,"highlight_word":31,"subhead":32,"trust_note":16,"cta":33},"PROPOSALS","Before the building exists.","before the building exists.","SAMRISK doesn't wait for completion. Create a \"proposed\" site and start tracking TPOs, easements, sub-surface services, planning constraints — before a brick is laid. When planning approves, convert the proposal into a real building with one click.",{"primary":34,"secondary":37},{"label":35,"to":36},"Start free","https:\u002F\u002Fapp.samrisk.co.uk\u002Fsignup",{"label":38,"to":39},"See pricing","\u002Fpricing",{},true,"\u002Ffeatures\u002Fproposals",{"ogTitle":5,"ogDescription":44,"title":5,"description":17},"Sites without buildings yet. Constraints, decisions, design submissions. Auto site-constraints PDF.",false,{"title":47,"subtitle":48,"items":49},"A proposal workspace, not a folder of PDFs","Capture the full pre-construction lifecycle in one place.",[50,60,70],{"eyebrow":51,"title":52,"description":53,"bullets":54,"visual":59,"visual_label":51},"VIABILITY","Concept → feasibility → design → submission → consent","Six status stages tracking the proposal lifecycle. Estimated value, viability score (1-5), budget-authorised flag. Decision-makers can see which proposals are worth backing without trawling through emails.",[55,56,57,58],"6 status stages","Estimated value + start \u002F completion dates","Viability score","Budget authorisation flag","i-lucide-trending-up",{"eyebrow":61,"title":62,"description":63,"bullets":64,"visual":69,"visual_label":61},"DECISIONS","Every design decision and meeting on the record","Decisions log captures iterations, meetings, stakeholder engagements, cost changes, risks identified. Each entry has type, title, body, date, decided-by. The audit trail your project board needs.",[65,66,67,68],"Six entry types — decision \u002F iteration \u002F meeting \u002F engagement \u002F cost \u002F risk","Decision date + decider name","Linked supporting documents","Chronological log per proposal","i-lucide-message-square",{"eyebrow":71,"title":72,"description":73,"bullets":74,"visual":79,"visual_label":71},"SUMMARY","Auto-generated site-constraints summary PDF","One click compiles TPOs, easements, sub-surface services, planning history, BNG status, environmental searches into a single printable document. Drops directly into your planning application bundle.",[75,76,77,78],"Pulls live from every land add-on you own","RLS-respecting — only data the user can see","Print-ready layout","Updates on every refresh","i-lucide-file-text","features\u002Fproposals",{"stats":82},[83,86,89,92],{"value":84,"label":85},0,"Buildings required",{"value":87,"label":88},"1-click","Constraints PDF",{"value":90,"label":91},6,"Status stages",{"value":93,"label":94},"Pro+","Included","FoEZrfhLvklHU36RvCci0c0eEckIEOnCW3TCEhWmy2Y",1779029146747]