[{"data":1,"prerenderedAt":256},["ShallowReactive",2],{"content-\u002Ffeatures\u002Fsafety-case":3},{"id":4,"title":5,"add_ons":6,"body":7,"comparison":28,"cta":51,"description":54,"extension":55,"faq":56,"feature_matrix":6,"features":6,"features_subtitle":6,"features_title":6,"hero":6,"hero_spotlight":76,"integrations":89,"layout":6,"meta":120,"navigation":34,"path":121,"personas":122,"plan":155,"plans":6,"process":159,"related_features":181,"sections":6,"seo":196,"show_cta":33,"showcase":197,"stem":241,"trust_bar":242,"__hash__":255},"content\u002Ffeatures\u002Fsafety-case.md","Building Safety Case (BSA 2022) — SAMRISK",null,{"type":8,"value":9,"toc":22},"minimark",[10,15,19],[11,12,14],"h2",{"id":13},"why-it-matters","Why it matters",[16,17,18],"p",{},"The Building Safety Act 2022 didn't make safety cases optional — every Higher-Risk Building needs one, every section of it has to be evidenced, and every piece of evidence needs to be traceable through its history. The \"golden thread\" is a legal requirement, not a buzzword.",[16,20,21],{},"SAMRISK puts the methodology (Bow Tie analysis, Major Hazard Reports, BSCR sections) and the evidence (documents, incidents, audits, inspections, PEEPs, complaints) in the same place. When the BSR turns up with questions, every answer is one click away from the source data — versioned, dated, signed off where required.",{"title":23,"searchDepth":24,"depth":24,"links":25},"",3,[26],{"id":13,"depth":27,"text":14},2,{"title":29,"rows":30},"vs. binders, spreadsheets, and generic compliance tools",[31,35,38,41,43,45,47,49],{"aspect":32,"spreadsheet":33,"generic":33,"samrisk":34},"BSR-recommended Bow Tie methodology",false,true,{"aspect":36,"spreadsheet":37,"generic":33,"samrisk":34},"Versioned BSCR with auto-version on status change","Manual",{"aspect":39,"spreadsheet":33,"generic":40,"samrisk":34},"Golden-thread document versioning","Partial",{"aspect":42,"spreadsheet":33,"generic":33,"samrisk":34},"MOR (Mandatory Occurrence Reporting) deadlines",{"aspect":44,"spreadsheet":33,"generic":37,"samrisk":34},"PEEPs (privacy-sensitive, role-gated)",{"aspect":46,"spreadsheet":33,"generic":33,"samrisk":34},"Change control with safety-case refresh flag",{"aspect":48,"spreadsheet":33,"generic":33,"samrisk":34},"Resident engagement + complaints register",{"aspect":50,"spreadsheet":37,"generic":40,"samrisk":34},"Specialised inspections (fire doors, AOVs, cladding)",{"headline":52,"subhead":53},"Stop authoring your safety case in Word","Add the Safety Case (BSA 2022) feature to any paid plan. £149\u002Fmo.","Author a Building Safety Case Report alongside the golden thread of evidence. HRB classification, accountable persons, Bow Tie analysis, Major Hazard Reports, MOR tracking, PEEPs, change control and specialised inspections — all in one place.","md",{"items":57},[58,61,64,67,70,73],{"q":59,"a":60},"What does \"HRB\" mean and is my building one?","Higher-Risk Building under the Building Safety Act 2022 — residential buildings ≥18m tall or ≥7 storeys with at least two residential units. SAMRISK helps you record the classification but doesn't make the legal determination — confirm with the BSR if you're unsure.",{"q":62,"a":63},"Do I have to use the Bow Tie methodology?","The BSR explicitly recommends it in their safety case guidance. SAMRISK supports it natively. If you have an alternative methodology, the Major Hazard Reports can stand on their own — Bow Ties are linked but not strictly required.",{"q":65,"a":66},"How does MOR (Mandatory Occurrence Reporting) work?","When you create an incident, flag it as MOR and pick a category. SAMRISK auto-creates the 10-day notification deadline + the 12-week full-report deadline. The incident detail page tracks submission status and the dashboard banners overdue MORs.",{"q":68,"a":69},"What's a \"golden thread\" and how do you implement it?","BSA 2022 requires every safety-relevant document to be traceable through its history. SAMRISK does this by versioning every document (full history kept, never deleted) and letting you reference specific versions from the BSCR, Major Hazard Reports, and incident records.",{"q":71,"a":72},"Are PEEPs visible to everyone?","No. PEEPs (Personal Emergency Evacuation Plans) contain personal data — only managers and admins can view the PEEPs page. The information is governed by GDPR + the data-sharing rules in your resident engagement strategy.",{"q":74,"a":75},"Do I have to refresh the BSCR every time something changes?","SAMRISK flags it for refresh automatically on material changes (fire strategy, structural, cladding, occupancy). For other changes the existing BSCR stays valid until your normal review cycle.",{"eyebrow":77,"headline":78,"highlight_word":79,"subhead":80,"trust_note":81,"cta":82},"BSA 2022","A safety case the BSR can read in one pass.","one pass","Built for Higher-Risk Buildings under the Building Safety Act 2022. Author the Building Safety Case Report alongside every piece of evidence that backs it up — versioned, linked, ready for the regulator.","BSR-recommended Bow Tie methodology, built in.",{"primary":83,"secondary":86},{"label":84,"to":85},"Start free","https:\u002F\u002Fapp.samrisk.co.uk\u002Fsignup",{"label":87,"to":88},"See all features","\u002Ffeatures",{"title":90,"items":91},"Connects with the rest of SAMRISK",[92,96,100,104,108,112,116],{"name":93,"description":94,"icon":95},"Documents","Versioned evidence references the golden thread.","i-lucide-folder",{"name":97,"description":98,"icon":99},"Risk assessments","Pull from your live assessment into the BSCR.","i-lucide-shield-check",{"name":101,"description":102,"icon":103},"Audits","Each audit is a frozen snapshot referenced by the safety case.","i-lucide-clipboard-check",{"name":105,"description":106,"icon":107},"Incidents","MORs are a flagged subset of the incident register.","i-lucide-alert-triangle",{"name":109,"description":110,"icon":111},"Items \u002F Fire safety register","Inspection history per device flows into the safety case.","i-lucide-flame",{"name":113,"description":114,"icon":115},"Compliance calendar","Statutory deadlines, audit dates, MOR deadlines side-by-side.","i-lucide-calendar-clock",{"name":117,"description":118,"icon":119},"Notifications","Daily check fires for stuck Bow Ties, overdue PEEP reviews, MOR deadlines.","i-lucide-bell",{},"\u002Ffeatures\u002Fsafety-case",{"title":123,"items":124},"Built for everyone in the safety-case chain",[125,133,140,147],{"title":126,"description":127,"icon":128,"bullets":129},"Principal Accountable Person","Owns the safety case end-to-end and signs off the BSCR.","i-lucide-user-check",[130,131,132],"BSCR workspace","Sign-off lock","Print-ready output",{"title":134,"description":135,"icon":99,"bullets":136},"Building Safety Manager","Maintains the golden thread day-to-day.",[137,138,139],"Bow Tie editor","Change control","MOR deadlines",{"title":141,"description":142,"icon":111,"bullets":143},"Fire safety \u002F structural engineer","Authors Major Hazard Reports + barrier effectiveness ratings.",[144,145,146],"Hazard narratives","Versioned reports","Bow Tie linking",{"title":148,"description":149,"icon":150,"bullets":151},"Resident-facing officer","Logs engagement + complaints under the BSA requirements.","i-lucide-users",[152,153,154],"Engagement strategy","Communications log","Safety-tagged complaints",{"free":156,"pro":157,"business":157,"enterprise":157,"note":158},"no","add-on","Safety Case is a £149\u002Fmo add-on available on any paid plan. It unlocks Bow Ties, Major Hazard Reports, BSCR workspace, PEEPs, change control, specialised inspections + MOR tracking on the existing Incidents feature.",{"title":160,"steps":161},"A safety-case workflow that follows the BSA",[162,166,170,174,177],{"title":163,"description":164,"icon":165},"Classify the building","Mark it HRB, set Accountable Persons, log BSR registration.","i-lucide-building-2",{"title":167,"description":168,"icon":169},"Bow tie the major hazards","One diagram per major hazard. ALARP justification per barrier.","i-lucide-git-fork",{"title":171,"description":172,"icon":173},"Write Major Hazard Reports","Narrative per hazard, linked to its Bow Tie + supporting evidence.","i-lucide-file-warning",{"title":175,"description":176,"icon":99},"Author the BSCR","Section-by-section with completeness tracking. Print or submit.",{"title":178,"description":179,"icon":180},"Maintain the golden thread","Every modification, MOR, inspection and complaint feeds back in.","i-lucide-link",{"title":182,"items":183},"Pairs well with",[184,187,190,193],{"title":97,"description":185,"icon":99,"to":186},"The live document the safety case wraps.","\u002Ffeatures\u002Frisk-assessments",{"title":93,"description":188,"icon":95,"to":189},"Golden-thread evidence storage.","\u002Ffeatures\u002Fdocuments",{"title":105,"description":191,"icon":107,"to":192},"MORs flow through the standard incident register.","\u002Ffeatures\u002Fincidents",{"title":101,"description":194,"icon":103,"to":195},"Frozen, signed-off snapshots referenced by the safety case.","\u002Ffeatures\u002Faudits",{"title":5,"description":54},{"title":198,"subtitle":199,"items":200},"Everything the BSR asks you to demonstrate","A purpose-built workspace, not a folder of PDFs.",[201,211,220,230],{"eyebrow":202,"title":203,"description":204,"bullets":205,"visual":165,"visual_label":210},"CLASSIFICATION","HRB classification + Accountable Persons","Mark the building as a Higher-Risk Building, log Principal Accountable Person details, capture scope of responsibility, and store the BSR registration reference. The whole header of your safety case in one place.",[206,207,208,209],"HRB toggle with height + storeys context","Principal + supporting Accountable Persons","BSR registration number + dates","Scope of responsibility narrative","HRB",{"eyebrow":212,"title":213,"description":214,"bullets":215,"visual":169,"visual_label":212},"BOW TIE","Bow Tie risk analysis (BSR-recommended)","Causes flow through preventive barriers to a top event, then through mitigative barriers to consequences. The methodology the BSR explicitly references. Visual canvas + ALARP justification per diagram.",[216,217,218,219],"Drag-build causes → barriers → top event → barriers → consequences","Effectiveness scoring on every barrier (1–5)","ALARP narrative per diagram","Approval workflow with status lock",{"eyebrow":221,"title":222,"description":223,"bullets":224,"visual":173,"visual_label":229},"NARRATIVE","Major Hazard Reports + Building Safety Case Report","Formal narrative documents for every major hazard (fire spread, structural failure, smoke control…) linked to their Bow Ties. The BSCR is the document you submit — built section-by-section with completeness tracking and a sign-off lock.",[225,226,227,228],"Tiptap rich-text editor per section","Auto-versioning on every status change","Print-ready layout with cover page","Completeness sidebar — knows what's missing","BSCR",{"eyebrow":231,"title":232,"description":233,"bullets":234,"visual":239,"visual_label":240},"GOLDEN THREAD","Documents versioned for the regulator","Every document keeps its full version history with a one-click swap to a new version. Reference any version from anywhere in the safety case. That's the golden thread the BSA requires.",[235,236,237,238],"Upload-new-version on any document","Full timeline with downloads of each historical version","Linkable from BSCR sections + Major Hazard reports","Stored on DigitalOcean Spaces, signed URLs","i-lucide-history","VERSIONS","features\u002Fsafety-case",{"stats":243},[244,246,249,252],{"value":210,"label":245},"≥18m or ≥7 storeys",{"value":247,"label":248},"BSR","Regulator-ready",{"value":250,"label":251},"Golden thread","Versioned evidence",{"value":253,"label":254},"MOR","Auto-deadlines","z2mfX4M9Bm_BJAiuAxkHzmKT5q3VP0c8cK2yYEDoARg",1779029146747]