PROCUREMENT

Material orders, tracked from request to delivery. tracked from request to delivery

Every fire door, every cladding shipment, every batch of concrete. Tracked through the order, the delivery, the install, the sign-off.

Versioned proof-of-delivery on every line.

6Lifecycle stages
CustomPer-building fields
PhotosAt every step
AuditTrail preserved

The full procurement lifecycle

REQUEST

Order materials, track to delivery

Place an order against an existing contract. SAMRISK tracks it from "pending" through "approved", "delivered", "installed", and "signed off" — with photo evidence at every step.

  • Six lifecycle states with clear transitions
  • Custom fields per building (batch number, supplier ref)
  • Attach delivery dockets and photos
  • Reject with reason for re-order

ORDERS

CUSTOM FIELDS

Capture what your project needs

Different buildings, different requirements. Set up fields like batch number, supplier reference, fire-classification cert, installation date — per building.

  • Configure once per company
  • Add building-specific fields where needed
  • Field types include text, dates, dropdowns, files
  • Audit-trail for every change

FIELDS

EVIDENCE

Photos and certificates attached

Delivery docket photos. Batch label photos showing fire-classification cert. Installation completion photos. Stuck to the order forever.

  • Mobile-friendly photo upload
  • Multiple attachments per order
  • Photos preview inline in the order
  • Sign-off requires evidence (configurable)

EVIDENCE

A typical material call-off

01

Site supervisor places order

From the construction or maintenance app.

02

Manager approves

With contract reference, expected delivery.

03

Delivery arrives, photo uploaded

Site team captures the delivery docket.

04

Installed and signed off

With completion photo and manager sign-off.

WHO IT'S FOR

Built for construction and FM workflows

Site supervisor

Places and tracks orders from the building.

  • Mobile order entry
  • Quick photos
  • Approval queue

Project manager

Oversees material schedules across multiple buildings.

  • Cross-building view
  • Status dashboards
  • Reporting

Contractor

Delivers and installs the ordered materials.

  • Per-order detail
  • Delivery evidence
  • Sign-off flow

Compliance team

Verifies fire-classification certs and installation records.

  • Audit trail
  • Cert verification
  • Building history

COMPARISON

Why not a paper docket system?

 SpreadsheetGeneric PM toolSAMRISK
Live status across the teamManual
Photo evidence at each step
Custom fields per buildingManual
Mobile-friendlyAwkwardYes
Fire-cert verification
Audit trail of changesPartial

INTEGRATIONS

Connects with the rest of SAMRISK

Documents

Attached dockets and certs join the file tree.

Contractors

Track who delivered or installed.

Building plans

Reference the floor or space materials were installed in.

Notifications

Status changes notify the right people.

Webhooks

Push order status to your ERP or procurement system.

AVAILABILITY

In your plan?

Free
ProIncluded
BusinessIncluded
EnterpriseIncluded

Material call-offs are available from the Pro plan upwards. See pricing →

Frequently asked questions

A material order placed against an existing contract — common in construction and facilities management. Rather than placing a fresh PO every time, you "call off" pre-agreed materials. SAMRISK tracks each one through its full lifecycle.

Why it matters

A paper docket lost in the truck cab is a fire-classification certificate you can't prove for a regulator. Material call-offs digitise the chain of custody — from the order, to the delivery, to the install, with photo evidence at every step. The audit trail you actually want.