Building Safety Act/Mandatory occurrence reporting

Mandatory occurrence reporting

General information as at October 2026. Not legal advice; check the regulation or ask a competent person.

The principal accountable person must run a system for reporting safety occurrences to the Building Safety Regulator: a notice within 10 days of becoming aware, then the full report within 10 days of that notice.

10
days from becoming aware to the notice
10
more days to the full report
20
days in all

What counts

A mandatory occurrence is an event, or a risk of one, that could cause a significant number of deaths or serious injuries through the spread of fire or the failure of the structure. It covers things found as well as things that happened: a missing fire stop found in a riser can be an occurrence even though there was no fire.

Everyday incidents that do not carry that risk are not mandatory occurrences, though they still belong in your incident records.

The deadlines

Two steps, each with its own clock:

  1. 1A notice to the Building Safety Regulator within 10 days of the principal accountable person becoming aware of the occurrence.
  2. 2A full report within 10 days of that notice, with what happened, why and what is being done.

The system behind it

The duty is to run a system, not just to send reports. People working on or managing the building need to know what to report and to whom, reports need to reach the principal accountable person quickly, and each one should be recorded with what was sent and when. Occurrences also belong in the safety case: each one is evidence about whether the barriers are working.

In SAMRISK

Incidents.

Incidents marks and tracks each occurrence. Reports go to the regulator through its own service.

  • Mark an incident as a mandatory occurrence and choose its category.
  • SAMRISK sets the 10 day notice and 20 day full report deadlines from the incident date you record, and shows each as on track, due soon or overdue.
  • Record when the notice and the full report were sent, and the regulator’s reference.
  • A daily check reminds you when the notice is due within 3 days or overdue.

In Pro, or £15 a month. Prices on the Pricing page.

The other guides

  1. Is my building higher-risk?The height, storey and homes test, how to measure, and registration.
  2. The safety case reportThe hazards, how they are managed, the evidence, and keeping it current.
  3. The golden threadWhat information to keep, in what form, and who can see it.
  4. Resident engagementThe engagement strategy, safety information and a route for concerns.

From the news

  1. High-rise safety across Manchester's towers27 Mar 2026 · 4 min
  2. The three gateways, in plain terms13 Mar 2026 · 5 min
  3. Canary Wharf and the weight of a safety case6 Feb 2026 · 5 min
  4. Building a safety case the regulator will accept23 Jan 2026 · 5 min