{ "Creating a site and drawing its boundary is free on every plan — including Free": { " Then add the ten land modules you need": "boundaries register, grounds, TPOs, BNG, sub-surface, risks, planning, proposals, drainage, setting. Each ships an interactive satellite-map workspace with statutory features tied to UK law competitors don't have." }, "trust_note": "Sites free on every plan. Add modules à la carte. UK-specific, built on the legal framework that actually applies.", "cta": { "primary": { "label": "Start free", "to": "https://app.samrisk.co.uk/signup" }, "secondary": { "label": "See pricing", "to": "/pricing" } } }

10Land modules
MapsOn every module
BNG30-year monitoring
SuDSSAB approval

Around, under, before — every layer of the land

The site shell — create a site, draw its boundary, documents, calendar — is free on every plan. Ten purpose-built modules sit on top, each tied to a UK statute, each with its own map workspace. Add what you need.

AROUND

Boundaries, grounds, and TPOs

Title register, easements, party walls, wayleaves. Tree and hedge register cross-referenced to Tree Preservation Orders with the 6-week LPA decision deadline tracker. Hedgerow Regulations 1997 "important" hedge protection built in.

  • Party Wall etc. Act 1996 notice trigger detection
  • TPO consent applications with auto-calculated deadlines
  • Hedgerow Regulations 1997 "important" hedge flag
  • Tree QR tags for inspection logging
Explore TPOs

AROUND

UNDER

Sub-surface services + Permit to Dig

Every buried service — gas, water, electric, fibre, sewer. Asbestos-in-ground records. Permit-to-Dig workflow with a six-item pre-excavation checklist (CAT scan, utilities contacted, hand-dig zone, asbestos screen, isolation plan) that gates the approval.

  • Buried-services register with route geometry
  • Permit to Dig with checklist-gated approval
  • HSWA 1974 buried-services duty of care
  • Asbestos-in-ground records (Control of Asbestos Regs 2012)
Explore sub-surface

UNDER

BEFORE

Pre-construction and BNG

A site without a building yet. Viability checklists, constraints mapping, decisions log. Statutory Biodiversity Net Gain accounting (DEFRA metric v4) with the 30-year monitoring plan and S106 / conservation-covenant compliance tracking.

  • Sites with zero buildings — proposed status
  • Site-constraints summary PDF for planning applications
  • DEFRA biodiversity metric v4 calculator
  • 30-year management plan + annual monitoring reports
Explore BNG

BEFORE

SEARCHES

Site risks and planning consents

Radon class (UKHSA), contaminated land status (s78A EPA 1990), flood zone (EA), coal authority, mining. Phase 1 and Phase 2 environmental reports cross-referenced. Planning consents register with pre-commencement condition tracking.

  • Annual postcode re-check against government datasets
  • Planning permissions with lapse-date tracking
  • Pre-commencement condition discharge workflow
  • S106 and S278 obligations as compliance items
Explore site risks