PROPOSALS

Before the building exists. before the building exists.

SAMRISK doesn't wait for completion. Create a "proposed" site and start tracking TPOs, easements, sub-surface services, planning constraints — before a brick is laid. When planning approves, convert the proposal into a real building with one click.

Included free with Pro, Business and Enterprise.

0Buildings required
1-clickConstraints PDF
6Status stages
Pro+Included

A proposal workspace, not a folder of PDFs

Capture the full pre-construction lifecycle in one place.

VIABILITY

Concept → feasibility → design → submission → consent

Six status stages tracking the proposal lifecycle. Estimated value, viability score (1-5), budget-authorised flag. Decision-makers can see which proposals are worth backing without trawling through emails.

  • 6 status stages
  • Estimated value + start / completion dates
  • Viability score
  • Budget authorisation flag

VIABILITY

DECISIONS

Every design decision and meeting on the record

Decisions log captures iterations, meetings, stakeholder engagements, cost changes, risks identified. Each entry has type, title, body, date, decided-by. The audit trail your project board needs.

  • Six entry types — decision / iteration / meeting / engagement / cost / risk
  • Decision date + decider name
  • Linked supporting documents
  • Chronological log per proposal

DECISIONS

SUMMARY

Auto-generated site-constraints summary PDF

One click compiles TPOs, easements, sub-surface services, planning history, BNG status, environmental searches into a single printable document. Drops directly into your planning application bundle.

  • Pulls live from every land add-on you own
  • RLS-respecting — only data the user can see
  • Print-ready layout
  • Updates on every refresh

SUMMARY

Proposals — questions

No — proposals work standalone. But the site-constraints summary becomes much richer when you also have TPOs, sub-surface, planning, BNG.