USE CASE

A construction project, properly tracked. properly tracked

New-build or refurb. Materials, deliveries, permits-to-work, contractor competence, hot works, daily updates. Business plan with the full operations toolkit.

Business £189/month — every operations feature included from day one.

Hot worksPermits-to-Work
MaterialCall-offs
VersionedDrawings
£189Per month

Built for the operations side of construction

Replaces the binder of permits, the WhatsApp group of material orders, and the Dropbox of drawings.

MATERIALS

Material call-offs from request to install

Concrete, cladding, fire doors, MEP. Each call-off has a request, an order, a delivery, an install, a sign-off — with photo evidence at every stage.

  • Customisable fields per material type
  • Photo evidence on every leg
  • Versioned proof-of-delivery dockets

PERMITS

Permit-to-Work for every hazardous activity

Hot works, confined space, working at height, electrical. Issued, approved, active, closed — with hazards, precautions, PPE captured per permit.

  • PtW types pre-loaded
  • Hazards + controls + PPE on every permit
  • Closure with sign-off + photo

CONTRACTORS

Competence + insurance on every subbie

Every contractor's RAMS, public liability, employers' liability, trade certifications. Expired? They can't be issued a permit.

  • Insurance + certification expiry tracking
  • Block assignment when lapsed
  • Per-building access if you've got multiple sites

DOCUMENTS

Versioned drawings + RAMS

One folder per discipline. Each drawing tracked through revisions — old versions never deleted, current version one click away.

  • Versioned upload on every document
  • Full version timeline
  • Linkable from permits + call-offs

Recommended setup

01

Plan

Business — 20 buildings, 50 users, £189/month. Every feature on.

02

Features in heavy use

Material call-offs, Permits-to-Work (via Contractors), Documents (versioned drawings), Tasks, Building plans, Items (for handover).

03

Add-ons (optional)

Safety Case (£149/mo) if you're building HRBs — golden-thread evidence collected from day one is far easier than reconstructing it post-handover.

04

Total cost

£189/month base. £338 with Safety Case bolted on for HRB projects. Extra buildings (£12/mo) if you run multiple sites concurrently.

Frequently asked questions

Yes. Invite each as a user (50 included on Business). Use per-building access control to scope them to the sites they're actually working on.

The construction reality

Construction projects generate paper at a pace nothing else does. Material call-offs, RAMS, permits, drawings, daily site reports, handover packs. SAMRISK gives every project one workspace where this lands in real-time — and at handover, the safety case practically writes itself because every piece of golden-thread evidence is already there, versioned and dated.